Capex underwritten before capital commits
Scope, budget range and programme are set at feasibility, as a low, base and high range with stated assumptions.
Delivery risk, underwritten by the desk that structured the capital.
AIS manages the build, fit-out and repositioning of institutional assets on behalf of owners and capital partners. We sit on the owner’s side of the table: independent of contractors, accountable to whoever is funding the project.
AIS provides institutional project management consultancy (PMC) for hospitals, hotels, campuses, and commercial and industrial assets. It is owner-side: capex is underwritten before capital commits and progress is verified before tranches release.
Capex overruns, entitlement slippage and unverified progress claims sit outside most investment memos. AIS prices them up front and monitors them through the build, using the same discipline it applies to verifying a mandate.
Scope, budget range and programme are set at feasibility, as a low, base and high range with stated assumptions.
Procurement, BOQ review and contractor evaluation run on behalf of the owner or the capital funding the project.
Site capture and contractor reports are compared against schedule before capital is drawn. Slippage feeds the execution-risk assessment.
Hospitals and specialty centres, from CLU-stage land to clinical fit-out and licensing readiness.
Renovation, rebranding and repositioning of operating hotels to brand standard, phased around live revenue.
University blocks, school and sports campuses, delivered to academic calendars.
Offices, SCO, senior living and mixed-use assets where an institutional buyer or lender will scrutinise the build.
Warehouses, logistics parks and industrial buildings, built to the occupier's specification and delivered against a leasing or commissioning date.
Most intermediaries step away at close. The delivery desk is already working while diligence is still running, and stays until the asset is handed over.
The capital mandate
A mandate is verified, diligenced and placed principal to principal, with every introduction approved by a person.
The delivery mandate
The same desk sets out scope and a capex range at feasibility, then oversees the build owner-side through to handover.
Capital mandateDelivery mandateTranche released only after progress is verified on site
Illustrative sequence. Real timing depends on the asset.
Capex estimates are indicative and never a substitute for a contractor BOQ.
Owner-side management of design, procurement, execution and handover, end to end.
Independent monitoring for investors and lenders funding a development or JV.
Condition survey, scope and capex range for an acquisition or rebrand.
On the ground, checking the work against the drawings and the programme.
Material and workmanship checks recorded before a stage is accepted.
Site safety standards set, inspected and recorded for every contractor on the project.
One accountable manager per project, reporting to the owner, not to the contractor.
We invite verified contractors to bid on the projects we manage. Each is checked on its financial and technical record, statutory registrations, safety record and insurance, then graded by category of work. Apply to be empanelled.
Where AIS also intermediates capital on the same asset, both engagements and their fees are disclosed in writing to every principal before either is signed.
PMC stands for project management consultancy: an owner-side team that manages design, procurement, execution and handover of a build. AIS provides institutional PMC for hospitals, hotels, campuses, and commercial and industrial assets.
Where AIS also intermediates capital on the same asset, both engagements and their fees are disclosed in writing to every principal before either is signed. Delivery oversight reports to the owner or the capital funding the project.
No. Capex estimates are indicative low, base and high ranges with stated assumptions. They are never a substitute for a contractor BOQ.
A feasibility note with a capex range, a design brief and consultant plan, a BOQ and tender package, a contract structure and change-control procedure, periodic progress reports with site evidence, draw certification for capital tranches, and a commissioning and handover pack.
Healthcare, hospitality, education, industrial and logistics assets, and commercial and institutional assets such as offices, SCO and senior living.